Wednesday, 28 January 2009

The New Frame


Went over to P&D today to see how the new frame is working out.  Its going to have a visible backbone, with the tank underneath, 35 degree rake  and about 3" stretch.  We will be running 23" wheels front and back and so will have to use a V-Rod drive belt, which really stretches the frame out - this will be one long bike.  Its my design and I am hoping that it will come together well.
The wheel rims arrived today from CMF in Devon, 23" Stainless, running 3.5" wide on the front and 4.25" wide on the rear.  I will be getting them built on the stock Harley hubs from the FXD.  My seat pans also arrived today from Chopper Shox in Las Vegas.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.